Installation
1 phase - 1 neutral
NOTE!
*The 2 phases (L1 and L2) should be secured by only one and the same earth leakage breaker.
Running L1/N1 threw a different earth leakage breaker than L2/N2 is not allowed.
3 phases (only for BE)
Connection diagram
NOTE!
Consult the wiring diagrams on the bottom of the appliance.
60
•
Open the cover of the connection terminal box.
•
Run the power cord through a cord strain relief (clamp) which
protects the cable from being pulled out.
•
Connect the wires according to your type of appliance.
2 phases - 2 neutral (only for NL)*
1 phase (only for BE)