1.2 Packing removal and machine positioning
We recommend unpacking the equipment as soon as it arrives in order to verify that it is complete and that it has not been damaged
during transport. Damage, if any, must be communicated immediately to the carrier, even in the event that such damage is only found
during installation. Damaged equipment may not, under any circumstances, be returned to the manufacturer without prior to written
warning and without the manufacturer's written consent.
Packing Removal
1.2.1
For correct removal of packing, follow the sequence of steps (1-5), using the following tools:
- screwdriver.
1
1
Machine positioning
1.2.2
For a correct operation of the machine, we recommend, when positioning the machine, that you:
- Place the cold room in an area that is well ventilated continuously and well away from all sources of heat.
- Do not install the machine on outside cold rooms.
- Check that the panels of the cold room are perfectly level.
- Place the machine in an easily accessible position, in order to facilitate inspections and maintenance operations.
- Place the machine in a zone where the most uniform cold distribution is possible.
- Ensure that the spaces around the air suction and exhaust grids of the machine are not blocked or reduced in size in any way (fig. 1.2.2).
CAUTION: Care must be taken when using the machine unit at altitudes of over 1000 m above sea level. Contact our technical
department.
We recommend, during the installation phase, that you don't tilt the machine too far, in order to avoid the spilling of oil from the
compressor into the refrigerating circuit what damages the compressor.
As a precaution, we recommend that you leave the unit switched off for several hours, in order to avoid any possible problems.
The machine should be positioned in the cold room by a qualified technician and following the steps (A....E) given below. Tools required are
as follows: -hand saw; -screwdriver; drill.
A) assemble the cold room floor, outer walls and ceiling elements not in the vicinity of the area where the machine is to be installed.
B) Make the necessary cuts and holes in the cold room panel, by respecting the formats given in the template.
C) Position the machine at the prepared place. Take care to balance of the machine.
D) Insulate the cuts made on the cold room wall, using filler or silicone.
E) Install the possible accessories (cold room light, door resistor, door microswitch, compensation valve, strip doors) in the best position
for use.
If it's provided, we advise you to connect the overflow pipe of the condensation tray to a flexible hose for water drainage.
WARNING! This machine is not designed for installation in environments with a potentially explosive atmosphere.