Download Inhoudsopgave Inhoud Print deze pagina

Wheel Horse B Series Servicehandleiding pagina 37

Inhoudsopgave

Advertenties

Fig. 5-34 Transaxle Front Bolts
12. Carefully align and lower the manifold pad in place and
install the two 3/8 inch bolts and two 1/2 inch bolts.
Make sure the special seal ring is used under the head
of the front 1/2 inch bolt.
13. Tighten all four bolts evenly and securely.
Fig. 5-35 Manifold Installation
14. I nstall both rear wheels.
15. Fill the transaxle with oil, start the engine, and check
for any leaks and proper operation. Adjust brake band.
Pump Removal
1. To remove the hydrostatic pump, follow instructions in
section 4 for engine removal. The engine may be moved
forward on the frame for access to the pump, or remov-
ed from the frame, as desired.
2. Disconnect and remove the battery.
3. Remove the right console panel, together with the bat-
tery supports.
5--11
SECTION 5
4. Disconnect all three control rods connected to the pump
linkage.
5. Remove
the
four cap screws
holding the front
manifold pad to the pump pad. The two rear screws
have elastic stop nuts on the top.
An oil drain pan
should be placed under this area, since there will be some
oil loss.
6. Disconnect the hydraulic lift tubes located at the top of
the pump.
7. Disconnect the temperature sending unit wire.
8. Remove the two 5/16 inch bolts and nuts that hold the
rear pump bracket to the steering gear support.
9. Remove the bolt that attaches the front pump bracket
to the left side panel.
10. Remove the pump and brackets.
If a new pump is to be installed, carefully change the
brackets and linkage from the old pump to the new
pump.
Pump Installation
1. Place a small amount of clean grease in the manifold
plate seal ring recesses and on the seal rings.
2. Place a small "0" ring in each of the low pressure port
recesses and a large "0" ring in each of the large high
pressu re port recesses.
3. Place a square section type backup ring over the top of
each of the large "0" rings, centering them.
4. To facilitate alignment of the pump to the manifold pad,
fabricate two aligning pins. Cut the heads off two 3/8-
16 x 2 bolts to make two studs. Saw a screwdriver slot
and taper the ends as shown in Fig. 5--37.
Fig. 5-36
"0"
Ring Ports

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

C seriesD seriesB-81

Inhoudsopgave