6.5 Fitting the cable guard
To fit the cable guard, proceed as follows:
1. Make sure that the submersible drop cable lies
flat in the cable guard.
2. Place the cable guard in the groove in the cable
plug. The two flaps of the cable guard must
engage with the upper edge of the pump sleeve.
See fig. 9.
Fig. 9
3. Fasten the cable guard to the pump suction
strainer with the two self-tapping screws
supplied. See fig. 10.
Fig. 10
11