5. Installation and Start-Up

5.1. General

In order to prevent damage to the mixer or serious injury
during installation the following points must be observed:
Installation work may only be carried out by qualified
persons. The safety instructions must be followed at
all times.
The mixer must be inspected for damages before any
installation work is carried out.
Protect the mixer from frost.
The operating area must be laid out for each machine.
You must ensure that lifting gear can be fitted without
any trouble, since this is required for assembly and
removal of the machine.
The maximum bearing capacity must be greater than
the weight of the machine, add-on units and cable.
Electric power cables must be laid out in such a way
that safe operation and non-problematic assembly/
dismantling are possible at all times.
The electric power cables should be fastened prop-
erly to the pipes with cable holders or other suitable
equipment. This should prevent loose hanging and
damage to the electric power cables. Depending on
the cable length and weight, a cable holder should be
fitted every two or three meters.
The structural components and foundations must be
of sufficient stability to ensure safe and functional op-
eration. The operator or supplier is responsible for the
provision.
Never let the unit run dry.
Use defector plates for the pumped fluid intake that
air cannot introduce into the pumped liquid. this will
lead to that the pump will run smoothly and is sub-
jected to higher wear and tear.

5.2. Installation

Danger of falling!
Installation work for the mixer and its accessories
is performed directly on the edge of the basin. Care-
lessness or wearing inappropriate clothing could
result in a fall. There is a risk of fatal injury! Take all
necessary safety precautions to prevent this.
Mixer
The mixer is delivered ready assembled. During installa-
tion of the mixer please check the following:
Propeller
The propeller must not touch the tank floor or walls in any
possible installation position (min. 20 cm distance).
Motor Cable
The cable must not be stretched even when the mixer is
completely lowered. The cable should be positioned with
always providing large bending radius in order to prevent
breaking. The connecting cable should be guided as tight
as possible towards the top, so it is not caught in the flow.
28 | ENGLISH