Connecting ribbon cables for the
90 or 120 A and for parallel
installation
Type of connections
connector
90 or 120 A SineWave™
inter-cubicle connector
SineWave™ parallel connector
Connection operations for parallel or
90 A or 120 A conditioners
Connection operations must be
carried out with the
conditioner de-energized.
Procedure:
wiring is connected via the bottom, in
front of the device;
remove the protection plate;
the conductor connectors must be
correctly locked;
shielding shall be earthed in
compliance with the indications given
below;
connector
shielding
shielding
earthing
block
90 A or 120 A
SineWave™
inter-cubicle
connection
configure the parallel connection
board using the indications in the table
below.
Signal cables connections
must be mechanically fixed
near the connectors so that any stress
on the conductors or conductor
shielding earthing is prevented.
20
type of conductors
shielded strand supplied (3 m)
shielded strand supplied (5 m)
20 A or 60 A parallel
conditioner connection
MERY
board
PARY
board
2 strands for
parallel connection
90 A or 120 A parallel
conditioner connection
MERY
board
PARY
board
1 cable for controlling the 2nd
90 A or 120 A cubicle
Close-up of connectors
inter-cubicle
connector
connection between two
boards
parallel installation connectors
2 equivalent connectors
installation and operation manual of SineWave™: E-51027008XT/AD
remark
connection between the 2 cubicles which make
up the 90 or 120 A SineWave™
loop connection allows parallel operation of the SineWave™
even if it is interrupted for the number of devices to be modified
1 cable for controlling
the 2nd 90 A or 120 A
cubicle
MERY board
PARY board
90 A or 120 A parallel conditioner
connection
MERY
board
PARY
board
2 strands for parallel
connection
2nd 90 or 120 A conditioner
cubicle connection
DUMY
board
cable coming from the 1st
90 A or 120 A cubicle
configuration straps and
switches for parallel
connection