Download Print deze pagina

ABAC PAT ZERO Handleiding pagina 57

Advertenties

DRAIN TANK
PRIOR TO ANY OPERATION SET THE PRESSURE SWITCH TO THE OFF POSITION,
PULL OUT THE PLUG AND COMPLETELY DRAIN THE RESERVOIR
Perform daily the operation by opening the manual drain valve and check for condensate.
N
Spent oil and condensate MUST BE DISPOSED OF in compliance with protection of
the environment and current legislation.
BELT TENSIONING
PRIOR TO ANY OPERATION SET THE PRESSURE SWITCH TO THE OFF POSITION,
PULL OUT THE PLUG AND COMPLETELY DRAIN THE RESERVOIR
Periodically, check the tension of the belts which must have a flexion (f) of around 1 cm.
P
MAINTENANCE
57
GB
O

Advertenties

loading

Gerelateerde Producten voor ABAC PAT ZERO