Download Inhoudsopgave Inhoud Print deze pagina

Unpacking & Commissioning - Howard Wright M9 TRANSFER Gebruiksaanwijzing

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

To unpack and commission the stretcher:
WARNING: Acceptance testing to national regulations needs to be undertaken after the product is delivered to
the healthcare facility i.e. after transit. This is the responsibility of the purchaser.
WARNING: Use an isolating transformer or an earth leakage device between the power cord and the mains
supply.
WARNING: Ensure that the power and handset cords are properly stowed and clear during any adjustment of
stretcher components to prevent cord and handset damage.
WARNING: Do not attempt to lift the stretcher by the deck once the transport ties have been removed.
CAUTION: Ensure that all transport ties have been cut and removed before using the stretcher.
CAUTION: Connect the stretcher to the mains power supply to maximise battery life. Fully discharging the
battery will reduce its life.
If the stretcher is not used for a long period of time it is recommended that the batteries charged for
a minimum of six hours once every three months.
1. Remove any external packaging.
2. Cut and remove all transport ties.
3. Read and understand the stretcher instructions for use manual.
4. Install the bed end.
5. Manoeuvre the stretcher into position and connect the power cord to the mains supply
(220-240 V AC, 50-60 Hz).
6. Check that the stretcher is operating correctly (see section 11.5 User Maintenance Checklist).
NOTE:
To manoeuvre the stretcher, release the brakes by setting the castor pedal into the neutral or steer
position.
5. UNPACKING & COMMISSIONING
M9 Transfer Instructions For Use (M999-190, Version 1, 2022-04)
9

Advertenties

Inhoudsopgave
loading

Inhoudsopgave