Download Inhoudsopgave Inhoud Print deze pagina

Installation / Assembly; Installing The Pumping Station, Floor-Standing - SFA Sanifos 110 Installatie En Gebruikshandleiding

Pompinstallatie voor afvalwater, voor ingraving of plaatsing
Verberg thumbnails Zie ook voor Sanifos 110:
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 78
Sanifos® 280 and Sanifos® 610
1 side input available : DN 50 or DN100
to be
drilled

5. INSTALLATION / ASSEMBLY

• PVC pressure PN10 or 16 (recommended by the manufacturer)
• Flexible "reinforced" type HDPE

5.1 INSTALLING THE PUMPING STATION, FLOOR-STANDING

• The characteristics shown on the rating plate have been compared with those on the order and installation (supply vol-
tage, frequency).
• The installation room must be protected against frost.
• The installation room is adequately lit.
• The work has been prepared in accordance with the dimensions shown in the example installation and standard
EN 12056-4.
• The plant room where the Sanifos® will be installed must be large enough to allow a 600 mm clearance around and
above the device to facilitate maintenance.
• Stop valves (provided with certain devices) must be fitted on the effluent inlets as well as on the discharge line, as close
as possible to the pumping station.
to be
drilled
Sanifos® 610 installation
Sanifos® 280 installation
with extension
Sanifos® 1300
1 side input available : DN 50 or DN100,
or DN160 according to the model
to be
drilled
EN
31

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Sanifos 280Sanifos 610Sanifos 1300

Inhoudsopgave