Download Inhoudsopgave Inhoud Print deze pagina

Package, Transport, Storage; Delivery; Transport; Storage - Homa HBP 503 Originele Handleiding

Verberg thumbnails Zie ook voor HBP 503:
Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

4. Package, Transport, Storage

4.1. Delivery

On arrival, the delivered items must be inspected for dam-
age and a check made that all parts are present. If any
parts are damaged or missing, the transport company or
the manufacturer must be informed on the day of delivery.
Any claim made at a later date will be deemed invalid.
Damage to parts must be noted on the delivery or freight
documentation.

4.2. Transport

The product is delivered by the manufacturer/shipping
agency in suitable packaging. This normally precludes
the possibility of damage occurring during transport and
storage. The packaging should be stored in a safe place if
the location used is changed frequently.

4.3. Storage

Newly supplied products are prepared that they can
be stored for at 1 year. The product should be cleaned
thoroughly before interim storage.
The following should be taken into consideration for
storage:
Place the product on a firm surface and secure it
against falling over.
We recommend a dry, frost-protected room with a
temperature of between 5 °C and 25 °C for storage.
The machine must be protected from direct sunlight,
heat, dust, and frost.
If the product has been stored for a long period of
time it should be cleaned of impurities such as dust
and oil deposits before start-up
If these rules are observed, your product can be stored
for a longer period. Please remember that elastomer parts
and coatings become brittle naturally. If the product is
to be stored for longer than 6 months, we recommend
checking these parts and replacing them as necessary.
Please consult the manufacturer.

4.4. Returning to the supplier

Products which are delivered to the plant must be
clean and correctly packaged. In this context, clean
means
that
impurities
decontaminated if it has been used with materials which are
hazardous to health. The packaging must protect the product
against damage. Please contact the manufacturer before
returning!
have
been
removed
and

5. Installation and commissioning

5.1. General

The following points must be noted to prevent damages in
the pump during installation and commissioning:
The installation work must be carried out by qualified
personnel in compliance with the safety regulations.
The pump must be checked for possible damages pri-
or to installation.
The minimum submersion in water must be consid-
ered for level control.
Air pockets in the pump casing and in pipes must be
avoided (by means of appropriate venting facilities or
slight tilting of the pump).
Protect the pump from frost.
The mechanical room must be designed for the re-
spective machinery. This includes also that a lifting
device for assembly/disassembly can be installed,
with which the installation site of the pump can be
reached without danger.
The power lines of the pump must run in a way that
hazard-free operation and easy assembly/disassem-
bly is possible.
The power line must be fixed professionally in the
mechanical room so that loose hanging of the leads
is prevented. Depending on the length and weight of
the leads a cable holder must be fitted every two to
three metres.

5.2. Installation

Risk of falling!
When installing the pump and accessories, work is
carried out directly on the water's edge! Careless-
ness or wearing the wrong shoes, can lead to falling.
Risk of death! Take all precautions to prevent this.
Attach the pressure line or the hose to the pump outlet
and lay the pressure line In order to prevent backflow of
the water when the pump is switched off, a check valve
can also be installed in the pressure line. The pressure line
must be fitted free of tension.
When using a hose, make sure that this is installed kink-
free. When using accessories, such as a quick coupling
or similar, it must be ensured that these are sealed with
Teflon tape, since any leak will reduce the capacity of the
pump.
Secure the pump on the handle with a cable or chain, and
lower it into the pumping medium. When using on muddy
or sandy ground, the pumps should be installed suspend-
ed from a rope, with the suction opening at least 30 cm
above the ground, so that the suction strainer is protected
from obstruction.
Floor installation
Install the pressure line using a Storz coupling onto the
central pressure port. The pressure pipe must be laid
without kinks. The inside diameter of the pipe must match
the pressure port. Place pump in the pumping medium.
When used on muddy, yielding ground, the pump must
be placed on top of stones or similar, or placed in a fine-
meshed basket, so that the suction filter is protected from
obstruction.
ENGLISH | 25

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Hbp 507Hbp 512

Inhoudsopgave