Download Print deze pagina

Stihl GHE 150 Gebruiksaanwijzing pagina 43

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 77
6. Standard equipment
Item
Designation
A
Basic unit with lower chute
B
Wheel carrier
C
Wheel axle
D
Wheel lock
E
Screw, M6 x 55
F
Hexagon nut
H
Quick fastener
I
Wheel
J
Wheel cap
K
Square nut
L
Washer Ø 17 mm
M
Bolt, M6 x 50
N
Discharge flap
O
Ejection chute extension
P
Strip
Q
Pin
R
Torx screw P5 x 20
S
Upper chute
T
Safety screw
U
Torx screw P5 x 10
V
Combination spanner
Instruction manual
0478 201 9913 D - EN
7. Preparing the machine for
operation
2
7.1 Attaching wheel axle and
Qty.
wheels
1
● Attach the wheel axle (C) with
1
wheel locks (D), bolts (E) and hexagon
nuts (F) to the wheel carrier (B) and
1
tighten using combination spanner (V)
2
(4 - 6 Nm).
2
● Push wheels (I) onto mounted wheel
2
axle.
2
Quick fasteners must be pushed
2
onto the wheel axle only to the
2
extent that the wheels can still turn
2
freely.
4
Quick fasteners are not reuseable
2
following removal.
1
● Push the quick fastener (H) onto the
1
wheel axle with the convex side facing
1
outwards.
2
● Press wheel caps (J) onto wheels.
3
1
7.2 Installing the chassis and
4
ejection chute
2
1
1 Install the ejection chute
extension
1
● Place the basic unit (A) onto a block of
wood with a height of approx. 15-
20 cm.
● Engage the hooks (1) of the ejection
chute extension (O) into the
openings (2) on the rear of the basic
unit (A) and turn the extension
downwards so that the front part of the
basic unit is precisely inserted in the
opening of the ejection chute extension.
● Fasten the screws (U) in the lugs of the
hooks (1) (1 - 2 Nm).
2 Attach the chassis
● Press square nuts (K) and washers (L)
in the recesses provided on the basic
unit (3).
3
● Push the chassis with both wheel
carriers (4) up to the stop in the guides
on the basic unit (5).
● Push bent section of wheel carrier (6)
into the recess on the ejection chute
extension (7).
● Insert the screws (M) with washers (L)
the openings in the wheel carriers (8)
and fasten using combination
spanner (V) (4 - 6 Nm).
3 Install strip
The bent section of the wheel
carrier (6) must be precisely
inserted in the recesses on the
ejection chute extension (7).
● Position the strip (P) and fasten
screws (R) (1 - 2 Nm).
● Lift machine into upright position.
4 Install the discharge flap
● Attach the discharge flap (N) and press
4
in pin (Q) (use a plastic hammer if
necessary).
Ensure that the ribs (9) inside the
discharge flap on the left and right are
all correctly located in the guide groove
of the ejection chute extension (10).
41

Advertenties

loading

Deze handleiding is ook geschikt voor:

Ghe 250Ghe 250 sGhe 260Ghe 260 s