Installation and startup
4.
If the wall is wooden, please add heat insulation material between Wolong inverter and the wooden wall.
5.
Do not expose the Wolong inverter to direct sunlight to avoid power reduction caused by excessive
heating. An ambient temperature below 45°C will guarantee the inverter to work in an optimal operating
state.
6.
Provide adequate ventilation for the inverter to ensure that heat is dissipated.
7.
If the inverters are installed in a residential area, they should be fixed on a concrete wall (a wooden wall
and plastic board are not recommended). If installed on a wooden wall, we do not recommend self-tapping
screws and wall plugs that are included with the inverter. Instead, please use the M6 bolt, nut, flat and lock
washer, each 4pcs (not included). The bolt should be 10mm longer than the thickness of the wooden
board in order to correctly fix the nut. The wooden board should be at least 15mm thick and made of a
strong wooden material to meet the strength requirements.
8.
Do not put anything on the inverter.
9.
Before cleaning, disconnect the Wolong inverter from the grid (by cutting off the AC breaker) and from the
PV generator (by cutting off the DC breaker) in order to exclude the danger of electric shock. Wait at least
5 minutes, then clean the unit with a soft, dry cloth. Never use corrosive, solvent-containing or abrasive
cleaners or polishes.
5.1.3
Mounting position
The unit has been designed for installations that require vertical or tilted backwards (by max. 15°) position.
1.
2.
Do not install the Wolong inverter tilted forwards.
3.
Do not install the Wolong inverter horizontally.
4.
Installing at eye level makes it easier to operate and read the display.