Download Inhoudsopgave Inhoud Print deze pagina

Completing Installation - Spartherm Odin Front Installatiehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

IN S TA LLA TION M A N U A L

5.7 Completing installation

Ø
Check if grit, dust or other materials are left behind in the chimney breast (odours).
Ø
Use clean fabric gloves and avoid fingerprints on the fire and flue pipes.
Ø
Check whether the interior lining and the baffle plates are fitted properly in the fire (if applicable see section 9
'Appliance-specific information'). Correct the position of these plates if necessary.
Ø
Check whether the holes of the secondary ventilation in the back plate are immediately facing the recesses in the
interior lining.
Ø
Clean the fire with a soft cloth and check it for damage. The fire can be sprayed with the spray can supplied.
Before doing this read the instructions for use on the label. Always first check the colour on a piece of white paper
or cardboard before you treat the fire.
First carefully read the user manual before starting to use the fire. We refer to the user manual for lighting and
burning the fire.
35

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Odin tunnel

Inhoudsopgave