7.6
Assemble the components
Mount the pump first, as the pump tries to start up when power is supplied to the control unit (SDS).
Reinstall the components in reverse order, at the same time perform a functional test (see "Commissioning", page 30).
Make sure that the motor-driven flap is open (indicated on the display) and that no faults are indicated on the control unit.
Document the maintenance in the control unit, set the next maintenance date.
8
Troubleshooting
Troubleshooting is described in the control unit's operating and maintenance instructions.
Installation and operating instructions
33 / 100