[Fig. 3.1.1] (P.2)
<In case of installation of the bottom intake panel>
<
In case of use of the optional canvas duct for bottom intake>
Model name
20 · 25 · 32
A
790
B
more than 455
C
more than 500
D
1000
E
more than 365
F
more than 100
G
more than 20
H
more than 100
I
more than 1000
Model name
63 · 71 · 80
A
1240
B
more than 455
C
more than 500
D
1440
E
more than 365
F
more than 100
G
more than 20
H
more than 100
I
more than 1000

4. Fixing hanging bolts

4.1. Fixing hanging bolts
(Use M10 hanging bolts. The bolts should be procured locally.)
(Give site of suspension strong structure.)
Hanging structure
Ceiling: The ceiling structure varies from building to one another. For detailed
information, consult your construction company.
1 Reinforcing the ceiling with additional members (edge beam, etc.) must be
required to keep the ceiling at level and to prevent the ceiling from vibrations.
2 Cut and remove the ceiling members.
3 Reinforce the ceiling members, and add other members for fixing the ceiling
boards.
For wooden construction
Use the tie beam (for one story building) or second-floor beam (for two story
building) as strength members.
To hang the air-conditioner, use a hard square timber of more than
6 cm if the distance between beams is less than 90 cm and a hard square
timber of more than 9 cm if the distance between beams is less than 180 cm.
[Fig. 4.1.1] (P.2)
A Ceiling board
C Tie beam
D Square timber for hanging the air conditioner
E Pitch
For reinforced concrete construction
As shown in the figure below, fix the hanging bolts, or use square timbers to fix
the hanging bolts.

5. Installing the unit

5.1. Hanging the unit body

s Bring the indoor unit to an installation site as it is packed.
s To hang the indoor unit, use a lifting machine to lift and pass through the
hanging bolts.
s Install the indoor unit before ceiling joist construction.
[Fig. 5.1.1] (P.3)
A Unit body
5.2. Confirming the unit's position and fix-
ing hanging bolts
s Use the gage supplied with the panel to confirm that the unit body and
hanging bolts are positioned in place. If they are not positioned in place,
it may result in dew drops due to wind leak. Be sure to check the positional
relationship.
40 · 50
1040
more than 455
more than 500
1440
more than 365
more than 100
more than 20
more than 100
more than 1000
100 · 125
1590
more than 495
more than 500
1765
more than 405
more than 100
more than 20
more than 100
more than 1000
B Edge beam
B Lifting machine
[Fig. 3.1.2] (P.2)
<In case of rear intake>
<In case of use of the optional filter box for rear intake>
Warning:
Be sure to install the unit in a location which can adequately support its
weight.
- If there is insufficient strength to support the unit's weight, it could fall and cause
injuries.
3.2. Combining indoor units with outdoor
units
For combining indoor units with outdoor units, refer to the outdoor unit installation
manual.
[Fig. 4.1.2] (P.2)
F Insert: 100 to 150 kg (1 piece) (field supply)
G M10 hanging bolt (field supply)
Product Weight (kg)
Model name
20 · 25
Body frame
25.5

4.2. Ceiling hole and hanging bolt positions

Ceiling Opening Hole and Sling Bolt Pitch
If a panel is used, use the gauge supplied with the panel so that the positions
of both the ceiling opening hole and the unit matche the dimensions in the
diagram below. Please refer to the instruction manual supplied with the panel
concerning how to use the gauge.
Use M10 sling bolts (continuous thread).
[Fig. 4.2.1] (P.2)
<In case of bottom intake, this drawing shows from above the indoor unit>
<In case of rear intake>
Model name
A
20 · 25 · 32
750
40 · 50
1000
63 - 80
1200
1136
100 · 125
1550
1486
s Use a level to check that the surface indicated by A A A A A is at level. Ensure
that the hanging bolt nuts are tightened to fix the hanging bolts.
s To ensure that drain is discharged, be sure to hang the unit at level using
a level.
Caution:
Be sure to install the unit body at level.

5.3. Changing to rear intake specifications

Changing the control box installation position
1. Remove one of the screws used to fasten the control box (Fig. 5.3.1).
2. Remove the control box cover (Fig. 5.3.1), then remove the intake sensor (Fig.
5.3.2) mounted in the box, and the piping sensor connectors (CN21, CN29),
LEV connector (CN60) and fan connector (FAN1) mounted on the control board.
H Reinforcement
32
40
50
63 ~ 80 100·125
27
32
34
39
B
C
D
E
686
670
32
986
936
670
32
1426
670
32
1426
710
32
1751
52
(mm)
F
263
453
253
228
7