installation
safety
installation
4.
safety
All necessary steps until commissioning has been carried out must
be carried out by a heating contractor. During this process the
installation instructions must be observed.
We only guarantee trouble-free function and operational reliability
if the original special accessories and spare parts intended for the
appliance are used.
5.
appliance description
5.1
standard delivery
The standard delivery includes the following parts, packed in a
separate bag.
- Operating and installation instructions
- Adjustable feet (only with SBP 200 E | SBP 400 E)
5.2
special accessories
description
BGC immersion heater
WPKI 5 compact installation
WPKI 6 compact installation
6.
installation
6.1
installation site
f Ensure the floor has a sufficient load bearing capacity (see
f
Specification table).
f Check the height of the room (see Specification table).
f
12
| sBp e | sBp e sol | sBp e cool
6.2
transport
Material losses
!
We recommend removing the cylinder casing during
transportation to the installation location.
6.2.1 Removing the cylinder casing
Removing the cylinder casing
1 Lid
2 Cylinder casing
3 Plinth fascia
f First remove the lid and then the plinth fascia.
f
Part no.
075115
6.2.2 sBP 700 e | sBP 700 e sol
220830
220831
These appliances have side insulation sections that can be
removed. This will make transportation through narrow doors
and passageways easier.
f Remove the retaining straps by opening the closures.
f
When reattaching the retaining straps, ensure that the closures
are near a joint between the casing parts.
6.3
Positioning
6.3.1 sBP 200 | sBP 400
f Fit the adjustable feet provided, these are already fitted on
f
SBP E cool appliances.
f Use the adjustable feet to compensate for any unevenness in
f
the floor.
6.3.2 sBP 700
These appliances do not have adjustable feet. The floor must
be level.
1
2
3