Inspect the packaging for damage and remove packaging at the
installation site. Verify presence of six brass thread to sweat fittings.
The installation site must be structurally capable of supporting the
weight of the tank when filled. The location has to be above freezing.
The water drainage pipe must be freeze proof.
Connection
A Refer to Diagram A and Diagram C.
Heating installation
C E The installation of the hydronic loop is shown in Diagram F. The
circuit must include a Temperature/Pressure Relief Valve, and air-vent, a
check valve, and an expansion tank.
Hot Water Installation
Prior to installation check that the local conditions are compatible with
the appliance design, especially that the maximum working excess
pressure of 150 PSI (10 bar.) is not exceeded
D
14
|Sbb plus
A steel or a copper pipe with insulation especially suitable due to its
low heat loss.
Required combination:
Cold water pipeline
Copper pipe
Steel pipe
Plastic
»
Flush the line thoroughly.
»
Fit the water outlet line.
»
Fit the water inlet line D .
An option, the connection pipe can be fitted between the feet. Du-
ring insertion, hold with a spanner. Check the stability of the con-
nection pipe and secure additionally on-site, if required. If required,
the cold water connection can be fitted directly onto the connector.
E
g
Hot water pipeline
Copper pipe
Steel or copper pipe
Steel or copper pipe
h
f
b
e d c b
www.stiebel-eltron-usa.com
a

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Sbb 400 plusSbb 600 plus

Inhoudsopgave