17. SAFETY

Read the following safety regulations carefully before you install
and use the charging station.

17.1 Safety instructions

Before you install the charging station, you must make sure the location is
safe for all bystanders. NEVER allow children onto this worksite. Never allow
ANYONE who has nothing to do with the work onto the worksite.
- Never be distracted while you are performing the work.
- Make sure you maintain a healthy posture at all times while doing the work.
- Do not leave any tools or charging station components unattended.
- Make sure any tools you are using are clean and dry.
- Make sure that the charging station, tools and components will stay dry
when it is raining.
Make sure that there is no danger of anyone tripping over
objects or paving while you are digging the hole for the
foundation.
Make sure to wear good, suitable gloves for any special actions
throughout the entire installation and connection process.
Always check any measuring instruments you will be using to
disconnect the installation from its power supply before you
use them, checking them several times to make sure they are
working properly.

18. MANDATORY CHECKS BEFORE INITIAL USE

The following checks must be carried out for commissioning
of the charging station. NEVER use the charging station if one
or more checks indicate that the power supply or stability of
the charging station do not meet requirements. Check the
insulation resistance between the phases as per NEN1010,
provision 61.3.3.
√ All work described below is in compliance with NEN 3140.
√ Check whether the proper order has been maintained for the connecting
terminals.