Download Inhoudsopgave Inhoud Print deze pagina

AO Smith IT 1500 Installatie-, Gebruikers En Servicehandleiding pagina 29

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

2.2.1
2.2.2
2.2.3
0312729_IT_1500-3000_NLENFR_V3.1, 2024-01-22
Cold water side
See (A) in the installation diagram (2.1 "Installation diagram").
1. Fit an approved stop valve (4) on the cold water side as required by the
applicable regulations.
2. The maximum working pressure of the water heater is 8 bar. Because the
pressure in the water pipe at times can exceed 8 bar, you must fit an approved
pressure-reducing valve (1).
3. Fit a non-return valve (5) and an expansion vessel (16).
4. Fit an expansion valve (15) and connect the overflow side to an open waste water
pipe.
Hot Water side
See (B) in the installation diagram (2.1 "Installation diagram").
Note
Insulating long hot water pipes prevents unnecessary energy loss.
Optional: fit a temperature gauge (12) so you can check the temperature of the
1.
tap water.
Fit the T&P valve (3).
2.
Fit a stop valve (11) in the hot water outlet pipe for servicing.
3.
Circulation pipe
See (C) in the installation diagram (2.1 "Installation diagram").
If an immediate flow of hot water is required at draw-off points, a circulation pump
can be installed. This improves comfort, and reduces water wastage.
1. Fit a circulation pump (6) of the correct capacity for the length and resistance of
the circulation system.
2. Fit a non-return valve (5) after the circulation pump to guarantee the direction of
circulation.
3. Fit two stop valves for servicing (4).
4. Connect the circulation pipe according to the installation diagram (2.1 "Installation
diagram").
29

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

It 2000It 2500It 3000

Inhoudsopgave