2
2.1 Installation diagram
Legend
1. pressure relief valve
(mandatory if mains water
pressure is too high)
3. T&P-valve (mandatory)
4. stop valve (recommended)
5. non-return valve
(mandatory)
6. circulation pump (optional)
9. drain valve
11. service stop valve
12. temperature gauge
(optional)
14. draw-off points
15. expansion valve
(mandatory)
16. expansion vessel
(mandatory)
A. cold water supply
B. hot water supply
C. circulation pipe
F. inlet heat exchanger
G. outlet heat exchanger
2.2 Water connections
28
Installation
Important
Three anodes are delivered with the storage tank. Mount the anodes with a liquid
sealant in the right connections (10) before installation. When anodes are not
mounted during operation, all warranty conditions are void.
Note
These products can be installed as vented and unvented. This manual only
discusses unvented installations. For information about vented installations please
contact A.O. Smith.
This figure shows the installation diagram. This diagram is referred to in the sections
describing the actual connection procedure.
Installation Diagram
Warning
The installation should be carried out by a competent person, in compliance with
general and locally applicable regulations.
12
11
3
9
Installation, Service and User Manual
14
14
14
16
15
A
5
1
4
IMD-0641 R1.0