Install to ABYC
All mounting holes must be
sealed with a marine grade
H-22 and E-11
sealant to prevent water
intrusion.
AIS (Aquatic Invasive Species)
Decontamination Process.
All of our pumps are designed to meet the ABYC standards
for the current AIS Decontamination procedure including low
pressure water at 120ºF for 130 seconds.
Please follow current guidelines for the decontamination
process.
14