Commissioning
Prepare boiler for first startup
1
M
H
B
All manuals and user guides at all-guides.com
Legend:
A
On/off switch
B
Return (ESC)
C
Room temperature control
D
Confirmation (OK)
E
Manual mode
F
Chimney sweeper mode
G
Info mode
H
Reset button
I
Operation mode heating zone(s)
L
Display
M Operation mode DHW
C
D
E
F
Preparation for first startup
Open the gas supply;
Enable the power supply to the boiler;
Switch on the boiler with the on/off
switch (1);
Make sure the boiler is in standby
mode (K);
Check the pump operation: make
sure the pump runs in the right
direction;
Release all air from the pump motor.
It's recommended to put the boiler on
50% load after the first startup, as this
is the best starting point to do a proper
combustion analysis. This can be done
with the following procedure:
I
Push button I >3 Sek, the boiler goes
L
into controller Stopp mode.
Push the Info button (G), the actual
G
boiler load (%) appears in the display;
Choose „set up" (confirm with OK
A
button), now the boiler load can be
changed by rotating the wheel (C)
and confirming the 50% setting with
the OK button.
After checking the combustion values
(see next page), the controller Stopp
mode can be stopped by pushing the
control mode button (I) >3 Sek.
15