Finish
√ Finish has been selected in the check list
and SET has been pressed.
One of 2 possible dialogues is displayed.
1.
Proceed as follows, depending on the dialogue.
• Dialogue Settings are incomplete: Press SET and
work through the open items in the check list.
• Dialogue Are all settings correct?
Press ESC to correct settings or press
SET for a longer period of time (> 1 s) to finish
initial commissioning.
2.
If SET is pressed for a longer time then the
inverter restarts and synchronises itself with
the grid (Fig. left).
5.4.10
Switching on the DC supply
Set the DC circuit breaker on the inverter to position I
(Figure 31). After testing via the internal MSD (approx.
2 minutes), the power fed into the grid can be shown on
the display (assuming that sunlight is present).
5.4.11
Feed-in management or PowerStorage
Feed-in management or PowerStorage
It is also possible to use an energy meter for feed-in management. It must be con-
nected to the Modbus RTU interface and comply with the following requirements:
The inverter communicates with energy meters through the Modbus RTU. The
following applies:
•
Only energy meters that were pre-programmed in the inverter can be used.
•
The pre-programmed energy meters are:
• Herholdt ECS3, item number: ECSEM72
• Janitza ECS3, item number: ECSEM68MID
• B+G SDM630, item number: 1141103
• Carlo Gavazzi EM24, item number: EM24-DIN.AV9.3.X.IS.X
•
The energy meter must measure in positive direction relative to the mains
network. Take note of the manufacturer's instructions
This menu point can alternatively be used to activate the PowerStorage function
when a Solar Frontier battery system is used. Details are provided in the Power-
Storage
manual.
Figure 28
11
Advice:
The settings regarding the feed-in manage-
ment must be provided in the energy man-
agement sub-menu.
Modus
1.
Press SET to call up this point.
2.
Press
activate PowerStorage.
3.
Press ESC.
4.
Press ESC to move up one level to energy
management.
Dynamic feed regulation
Advice:
The power fed into the mains network is set
in 10 W steps.
It can be limited to a minimum of 0 W.
Configuration energy meters
Advice:
The inverter can only work with energy me-
ters that have already been pre-programmed
in the inverter. The pre-programmed energy
meters are listed under Meter Type.
1.
Press SET to call up this point.
2.
Press
3.
Press ESC.
4.
Press ESC to leave the sub-menu.
Advice:
The connection to the energy meter can be veri-
fied with a connection test.
5.4.12
Registration and configuring PowerMonitoring
The registration and the monitoring set-up can be performed once commission-
ing has been completed.
Please follow the link to be found on the sticker attached to the front of the device
housing. Follow the guided registration process to its end. Additional information
regarding registration can also be found at this
5.4.13
De-installing the inverter
Danger
Risk of death by electrocution!
Only technical professionals may perform the work described in section
De-installing the inverter.
Observe the warning notes in 5.4.1.
Switching off AC and DC supplies
1. Turn the AC circuit breaker to off.
2. Set the DC circuit breaker on the inverter to position 0
(Figure 29).
to mark the energy meter or to
to mark the meter type.
link.
Figure 29