Deviations from the specifications dictated in the PQ, are to be reported in the deviation report.
The PQ is concluded if all criteria of acceptance are approved and the possible deviations are rectified or accepted.
Measurement – Pull-down
ID
Description
P-11
The test is intended to provide substantiation for the time it takes for the inside of the
cabinet to reach the setpoint temperature specified in P-5.
The initial temperature in the working space is the ambient temperature specified in P-5.
The temperature inside the cabinet must be stabilized in all points of the working space.
When the system is stable. Turn on the power to the cabinet.
The measurements, throughout the pull-down test, must be documented and
attached the PQ.
Duration:
Attachment:
Notes:
P-12
The time it takes the inside of the cabinet to achieve the setpoint temperature
measured in the absolute centre, must not exceed the time-frame specified in
the appendix.
Have the criteria been met?
Attachment:
Notes:
Name:
Conducted by:
Inspected / verified by:
106
Signature:
Model: ________________________
Accepted
Yes
Approved
Date:
(Yes / No):
SN: ________________________
No