Download Inhoudsopgave Inhoud Print deze pagina
Inhoudsopgave

Advertenties

ENGLISH
1/2-3/4 Nipple
Inlet Hose
Outlet Hose
Fig. 11
6. START-UP PROCEDURE
1) Disconnect the power supply.
2) Open the water tap.
3) Connect the power supply and energise.
4) The following should occur in sequence:
a) Compressor will start (Hot Gas Valve open).
b) Water Pan will fully open.
c) Water Solenoid will open.
d) Water Pan will start to close (Hot Gas Valve closed).
e) Water Pan fully closed - Pump Motor will start.
f) Water Solenoid will close.
IMPORTANT
1. Check the conditions and quality of the ice production.
2. Do not use ice produced in the trial run. It might be contaminated
with foreign matter in the water circuit. Discard or flush
down the drain.
3. Clean the Storage Bin before use (see "III. 1. CLEANING" in
Instruction Manual).

7. FINAL CHECKS

1) Is installation free of water leaks?
2) Is the icemaker free from vibration?
3) Are all the panels fixed and secure?
4) Has the user been instructed on correct machine use and handed
the Instruction Manual?
All manuals and user guides at all-guides.com
Icemaker
Cooling Water
Inlet Rc1/2
Cooling Water
Outlet Rc1/2
Potable Water
Inlet G3/4
Outlet Hose
Bin
Drain Outlet R3/4
4

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Im-240awme

Inhoudsopgave