INSTaLLaTION

Commissioning

Material losses
!
When making the connection to a standard safety socket
(in the case of a power cable with plug), ensure that the
socket is freely accessible after the appliance has been
installed.
Material losses
!
Observe the type plate. The specified voltage must match
the mains voltage.
f Connect the power cable as shown in the wiring diagram
(see chapter "Specification / Wiring diagram").
11. Commissioning

11.1 Initial start-up

f Fill the appliance by running the tap several times until the
pipework and appliance are free of air.
f Carry out a tightness check.
14
| EIL Trend
f Insert the power cable plug, if present, into the standard
safety socket or set the fuse/MCB.
f Check the appliance function.
f In the case of oversink installation, affix the company logo
supplied over the existing company logo.

11.2 Appliance handover

f Explain the appliance function to users and familiarise them
with how it works.
f Make the user aware of potential dangers, especially the risk
of scalding.
f Hand over these instructions.

11.3 Recommissioning

Material losses
!
Following an interruption of the water supply, recommis-
sion the appliance by carrying out the following steps,
in order to prevent irreparable damage to the bare wire
heating system.
f Isolate the appliance from the power supply. Pull
the power cable plug, if present, from the socket, or
remove the fuse/reset the MCB.
f See chapter "Initial start-up".