INSTALLATION INSTRUCTIONS
Connections
appliance
right-hand zones
interior
middle zones
left-hand zones
Common connections:
•
3 phases with 1 zero connection (3 1N, 400 V ~ / 50 Hz):
º
The voltage between the phases and the zero is 230 V ~. The
voltage between the phases is 400 V ~. Fit a connecting bridge
between connecting points 4-5. Phase 3 carries no load. The
groups must have fuses of at least 16 A (3x). The core diameter
of the connecting cable must be at least 2.5 mm
•
2 phase and 2 zero connection (2 2N, 230 V ~ / 50 Hz):
º
The voltage between the phases and the zeros is 230 V ~.
º
The group must have fuses of at least 16 A (2x). The core
diameter of the connecting cable must be at least 2.5 mm
Special connections:
•
Single phase connection (1 1N, 230 V ~ / 50 Hz):
º
The voltage between the phase and the zero is 230 V ~.
Fit a connecting bridge between connecting points 1-2 and
4-5. The group must have a fuse of at least 32 A. The core
diameter of the connecting should be at least 6 mm
Connection for hobs with 5 cooking zones:
•
3 phases with 1 zero connection (3 1N, 400 V ~ / 50 Hz):
º
The voltage between the phases and the zero is 230 V ~.
º
The voltage between the phases is 400 V ~. Fit a connecting
bridge between connecting points 4-5. The groups must have
fuses of at least 16 A (3x). The core diameter of the connecting
cable must be at least 2.5 mm
The bridges on the connecting block can be used to create the
required connections, as indicated in these illustrations.
Fix the cable with a pull relief and close the cover.
Conneting point, wall-mounting socket and plug must be accessible
at all times.
GB 39
Electrical connection
.
2
.
2
.
2
.
2