Operation
6
Operation
6.1
General
●
Connect the device (EXG) as described, with the support frame or use the handle for manual operation by 2
persons at the handles.
●
Position the device (EXG) centrically on the gripping good (e.g. kerb stone).
●
Release the locking hook (2), to lift and transport the device (EXG) together with gripping good (e.g. kerb
stone).
●
Lift the device with the load.
●
Lowering the device and position the gripping good on the ground. Then lock the locking hook (2), to lift the
device (EXG) without gripping good.
Transport position of the device (without load)
5310.0370
Fig.1
Fig.2
V2
2
Locking hook (to transport the device
without a gripping good)
Gripping position of the device (with load)
15 / 19
Fig.3
GB