Download Inhoudsopgave Inhoud Print deze pagina

Evaluation Of The Performance; Settlement Of Outdoor Unit - LG PM07SPNSJ Installatiehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Outdoor unit
Manifold valve
Pressure
gauge
Open
Vacuum pump
* The feature can be changed according
a type of model.

Settlement of outdoor unit

1
Fix the outdoor unit with a bolt and nut
(ø10 mm) tightly and horizontally on a
concrete or rigid mount.
2
When installing on the wall, roof or
rooftop, anchor the mounting base
securely with a nail or wire assuming the
influence of wind and earthquake.
3
If the vibration of the unit is transmitted to
the pipe, secure the unit with an anti-
vibration rubber.
Bolt
Close
Tubing connection

Evaluation of the performance

Operate the unit for 15~20 minutes, then
check the system refrigerant charge:
1
Measure the pressure of the gas side
service valve.
2
Measure the air temperature from inlet and
outlet of air conditioner.
3
Ensure the difference between the inlet
and outlet temperature is more than 8 °C.
4
For reference; the gas side pressure at
optimum condition is shown on table
(cooling)
The air conditioner is now ready to use.
Discharge air
* The feature can be changed according
a type of model.
for R410A
Outdoor
Temperature
35 °C (95 °F)
for R32
Outdoor
Temperature
20 °C (68 °F) ~
35 °C (95 °F)
35 °C (95 °F) ~
40 °C (104 °F)
40 °C (104 °F) ~
45 °C (113 °F)
45 °C (113 °F) ~
48 °C (118 °F)
INSTALLATIE
27
Inlet temperature
Discharge
temperature
Pressure of Service
Valve (Gas)
2
8.5~9.5 kgf/cm
G
(120~135 psi)
Pressure of Service
Valve (Gas)
2
8.4~9.5 kgf/cm
G
(120~135 psi)
2
9.5~10.5 kgf/cm
G
(135~150 psi)
2
10.5~11.6 kgf/cm
G
(150~165 psi)
2
11.6~12.3 kgf/cm
G
(165~175 psi)

Advertenties

Inhoudsopgave
loading

Inhoudsopgave