Before installing the machine it is advisable to check the efficiency of the water mains (n° 10 fig.1) and of the electrical connections (n° 1 fig. 1)).
An electric cut-out (n° 2 fig. 1) with fuses rated for the machine's electrical input is needed for the machine to be properly connected. Attention:
the earth connection (yellow/green wire) is mandatory.
Finally, the efficiency of the main drain pipe must be checked before it is connected to the machine's drain pipe (n° 4 fig.1).
Hydraulic connections:
- Water inlet: pipe 3/8 union int. ø 10/12 mm.
- Drain - pipe: int. ø 16/17 mm.
Locate the machine on the shelf and find a suitable position for the water softener (n° 7 fig. 1). Connect the softener to the tap (n° 9) using the
pipe (n° 8 fig. 1). Connect the pipe (n° 6) to the water inlet. Connect pipe (n° 4) to the drain tray and then to the main drain pipe (n° 5). Place a
recipient under the water softener's discharging pipe (see regeneration instructions page 9). Open tap (9) and run the water through for a few
minutes to clean the softener.
Make the electrical connections, connecting the power supply cord (n° 3 fig.1) to the mains line switch (n° 2).
Turn the switch knob to position 1.
The machine is fitted with water level control, the boiler will therefore be filled automatically (green indicator light turns off when filling completed).
When the water in the boiler reaches the right level, set the main switch knob to position 2 to switch the heating element on. Wait until the machine
reaches working pressure (red indicator light off); open the steam tap for a few seconds and then close it again. Check that the boiler pressure
is around 0.9/1 bar. The boiler pressure can be regulated using the pressure switch (see page 7 for regulation). Make a coffee and check the
delivery pressure on the manometer: it should be 9 bars. The delivery pressure can be regulated by using the screw located on the pump bypass
(see page 7).
For the AmericaPlus and MaxiAmerica models, after having turned the general switch on, press also the switch (yellow button) which feeds the
dosing grinder: the appliance switches grinding on and off so that the doser is always full. Check that the grinder contains always enough
coffee beans.
Press the switch located above the selected group to start delivery. When the required quantity has been delivered, press the switch again to
stop it.
You can regulate the quantity of brewed coffee on the screws (det. A fig.2) which are placed on top of the commutator. The quantity increases
by turning the screw towards the
Fig. 2 Commutator
Belle Epoque

Location and connections

P semi-automatic version operation
Digital automatic version dose regulation
+
, whereas it is reduced when you turn the screw towards the
-
+