Download Inhoudsopgave Inhoud Print deze pagina

Installation; Boiler Fixing; Fuel Supply - Riello Gulliver RG0.R Installatie-, Gebruiks- En Onderhoudsvoorschriften

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

3.

INSTALLATION

THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1 BOILER FIXING
Put on the flange (1) the screw and two nuts, (see fig. 2).
Widen, if necessary, the insulating gasket holes (5).
Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interposing the
insulating gasket (5), (see fig. 3).
Fig. 2
E9076

3.2 FUEL SUPPLY

The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and closing plate (2) should be reversed, (see fig. 4).
1
2596
1
2
E9075
Fig. 4
2
3
GB
2
5
4
Fig. 3
3
1
D4073

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Gulliver rg0.1r367 t1368 t1373654737365503736747 ... Toon alles

Inhoudsopgave