• Mount the vent surround frame (R – Fig. 19-20) supplied
with the pellet loading drawer, in place of the one previously
removed.
• Refit the slotted-in upper grille (N – Fig. 21), the lower grille
(O – Fig. 21) and the metal profile plate (Y – Fig. 21) using the
screws previously removed.
• Open the pellet front loading drawer (S – Fig. 22), load the
pellets by pushing them inside the drawer using the scoop
provided (T – Fig. 22).
INSTALLATION
fig. 19
R
fig. 20
fig. 21
T
fig. 22
- 45
-
R
N
O
Y
S