Download Inhoudsopgave Inhoud Print deze pagina

Commissioning And Functional Check; Positions Of The Ecolift Swa Emergency Closure Lever - Kessel Ecolift L Inbouw- En Bedieningshandleiding

Inhoudsopgave

Advertenties

5

Commissioning and functional check

5.1
Open the shut-off valve
The shut-off valve was pushed in for transport.
Before commissioning, always open the shut-off valve!
Then engage the circlip in position.
5.2

Positions of the Ecolift SWA emergency closure lever

Position
Function
"OPEN"
Operating posi-
(lever in
tion
sewer-side
position)
"CLOSED"
Pipe locking in
(lever in
the event of a
house-side
breakdown or
position)
decommission-
ing
40 / 152
Effect
The consumers connected can be drained and are
secured by the motor-driven backwater flap.
The building is secured in the best possible way
against water penetration; the consumers can be
drained.
Installation and operating instructions
Side view
016-319

Advertenties

Inhoudsopgave
loading

Inhoudsopgave