Download Inhoudsopgave Inhoud Print deze pagina

Pentair Jung Pumpen PLANCOFIX Gebruikershandleiding pagina 7

Inhoudsopgave

Advertenties

Test run
Motor noises on starting up are not a
cause for concern as they are normal in
synchronous motors.
ATTENTION! Carry out a trial run be-
fore laying the screed. Fill water in from
above through the floor drain and get
the Plancofix to pump out several times.
Look for any leaks around the inlet and
the pressure pipe. Later changes can
only be made with a considerable effort.
Laying the screed
The entire area can now be filled with
screed.
After the screed has set, the enclosed
square seal is bonded to the integrated
sealing strip. After the customer has at-
tached a further thin-bed waterproofing
system, the area can be tiled.
Secondary drainage
Secondary drainage can be provided
by drilling holes (Ø 5mm) all round the
edge above the sealing membrane.
Information on sealants and adhesives
can be found in the information sheet
on "Composite sealing" issued by the
professional association of the German
tile industry within the German Con-
struction Confederation (ZDB).
Both of the stainless steel cover ele-
ments (top) can also be completely tiled
over (bottom). To do so, just turn the
larger element over, and use the small-
er element without a drain.
ENGLISH
MAINTENANCE
The system is largely maintenance-free.
From time to time, however, remove
soap residues from the inside of the
tank. To do so, just lift the cover off and
carefully clean the inside of the tank.
ATTENTION! Do not use aggressive
drain cleaners!
If the hydraulic system is blocked, pull
the red fixing element upwards and take
it out. Next, gently loosen the hydraulic
system and remove it. After cleaning,
make sure that when you re-insert it,
the swing-type check valve and the two
seals are firmly in place. Finally, insert
the red fixing element.
7

Advertenties

Inhoudsopgave
loading

Inhoudsopgave