INSTALLATION
Preparations
8.
Preparations
8.1
Installation site
f Always install the appliance in a room free from the risk of
frost and near the draw-off point.
f Ensure the floor has sufficient load bearing capacity and
evenness (see chapter "Specification / Data table").
f Observe the room height and height when tilted (see chapter
"Specification / Data table").
Minimum clearances
SBB 600 WP SOL:
≥200
SBB 800-1000 WP SOL:
≥200
f Maintain the minimum clearances.
www.stiebel-eltron.com
≥200
≥200
8.2
Transport
For handling/lifting, use the lifting eyes provided, but never the
"Optional DHW outlet" connection at the top of the appliance.
9.
Installation
9.1
Fitting the thermal insulation, if appropriate.
f Position the appliance in its intended site.
f Fit the thermal insulation according to the instructions sup-
plied. For this, ensure that there is enough space for the
installation task. You can then link the appliance into the he-
ating and DHW system.
9.2
Fitting the signal anode
Material losses
!
When operating the cylinder without consumption indi-
cator, leave the plug in the fitting.
f Pull the plug out by simultaneously pushing the pressure
ring down.
f Push the open pipe end of the consumption indicator into the
aperture for the anode.
9.3
Fitting the thermometer and temperature
sensor
f Insert the thermometer as far as it will go and align it.
f Insert the temperature sensor as far as it will go into the
sensor well for the HP return sensor. Apply heat conducting
paste.
9.4
Where appropriate, fit the flanged or threaded
immersion heater.
f Remove the dummy flanges and plugs in order to mount the
flanged or threaded immersion heater. Maintain the DC sepa-
ration towards the cylinder.
SBB 600-1000 WP SOL |
17