Download Inhoudsopgave Inhoud Print deze pagina

Commissioning - Kessel Minilift S Originele Gebruiksaanwijzing

Verberg thumbnails Zie ook voor Minilift S:
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 93
5.

Commissioning

▶ Check whether the steps explained in the chapter on assembly have been
carried out correctly.
▶ Clear any building waste from the tank if necessary.
▶ Connect the system to the power supply. Lift the float switch to check whether
the submersible pump starts automatically.
✓ Connecting the connection cable(s) to the power supply switches the system
on.
L Dry running of the pump must be avoided.
42
Installation and operating manual
016-083_02

Advertenties

Inhoudsopgave
loading

Inhoudsopgave