Heed the pump's own weight and use tested hoisting gear e.g. lifting slings.
4.5
Setting up the pressure pipe connection
Version A
The pressure pipe connection is made with PE DN 80 (OD=90 mm).
KESSEL recommends connection of standard PE-HD electro-welded sockets.
Version B
Alternatively, the pressure pipe can also be connected using standard clamp con-
nectors (see KESSEL accessory art. no. 28090/28091/28092).
4.6
Installing the ventilation pipe
Saw off the socket for the ventilation pipe to the required
length.
Route the ventilation pipe (DN70) out of the chamber.
4.7
Installing the control unit
Install the control unit in accordance with the instructions enclosed with the unit.
Safely lay all cables of the electrical components.
4.8
Establishing electrical connections and level measurement connection
NOTICE
Disconnect system from energy sources!
Ensure that the electrical components are disconnected from the electrical power supply during the work.
Make all connections as described in the instructions enclosed with the control unit.
4.9
Mount the accessory parts
Compressor set for air bubbling
If special installation conditions exist, a compressor set for air bubbling should be installed.
Special installation conditions
Length of pressure hose > 10m
Laying of the pressure hose with continual upward gradient not possible
Condensate formation in the pressure hose
Connect the pressure hose in accordance with the enclosed installation instructions.
26 / 100
Pumping station / Installation and operating instructions
2
1
010-695_05