Download Inhoudsopgave Inhoud Print deze pagina

Hang The Device In Place - Berbel Skyline BDL 95 SK Gebruiks- En Montagehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Installation
The Wieland socket, cable anchor and earthing cable can
be installed in the pre-drilled positions on either side of the
ceiling mounting plate.
D WARNING
Risk of death due to electric shock.
Touching live parts can cause an electric shock, burns or
death.
☞ Ensure that the power supply is switched off and remains
so.
☞ Observe the voltage specifications on the ratings plate.
☞ Connect the Wieland socket to the ceiling connection
plate.
☞ Connect the Wieland socket to the power supply
provided by the customer.
☞ Route the cables so that they are not kinked, crushed or
damaged.
☞ Make sure that the device can be disconnected on all
poles from the electricity supply after installation.
74
All manuals and user guides at all-guides.com
3.5.5

Hang the device in place

D WARNING!
Danger of injuries through improper handling.
Hanging the device requires a great deal of physical exertion
due to its size and weight. If the device falls down, serious
injuries are possible.
☞ Three persons are required to hang the device.
☞ Ensure stable footing when hanging the device.
☞ Ensure that no other people are in the working area.
D ATTENTION!
Danger of property damage through improper handling.
Hanging the device requires a great deal of physical exertion
due to its size and weight. If the device falls, the device,
kitchen furnishings and other objects could be damaged.
☞ Cover the cooled hob.
☞ Keep the installation area clear.
☞ Have two persons lift the hood body.
☞ Align the hood body.
y The distance to the ceiling mounting plate must be
less than 800 mm.
y The mains cable is at the rear on the right when
viewed from the front.
6002782_b – 14.09.2016

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Inhoudsopgave