Download Inhoudsopgave Inhoud Print deze pagina

Berbel Skyline BDL 95 SK Gebruiks- En Montagehandleiding pagina 73

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Installation
☞ Make sure that the legal safety clearances will be
complied with:
y Recommendation 400 mm.
y With gas hobs, at least 650 mm.
D WARNING
Hazard due to explosions or electric shock.
Drilling through gas, water or electrical lines can lead to
hazardous situations.
☞ Ensure that there are no lines in the ceiling at the
fastening points.
Ø 8
☞ Determine the locations of the fastening points and mark
them:
y 2 bolt anchors inside the lock holes.
y 2 bolt anchors in the centre of slots.
☞ Drill the holes in the ceiling.
☞ Insert the bolt anchors into the holes.
☞ Ensure that the bolt anchors are tight in the holes.
6002782_b – 14.09.2016
All manuals and user guides at all-guides.com
☞ Screw the nuts and the washers onto the bolt anchors in
☞ Ensure that there is at least a 6 mm gap between the
65
☞ Push the ceiling mounting plate over the nuts in the lock
☞ Twist the ceiling mounting plate so that it is held by the
☞ Ensure that the ceiling mounting plate is hanging
☞ Screw the nuts and the washers onto the bolt anchors in
☞ Ensure that the ceiling mounting plate is aligned parallel
☞ Tighten the nuts cross-wise using the spanner.
☞ Ensure that all nuts are fully tightened.
The ceiling mounting plate is hanging securely and aligned
correctly on the ceiling.
6
the position of the lock holes.
ceiling and the top edge of the washers.
holes.
nuts.
securely.
the slots.
to the hob's front edge.
73

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Inhoudsopgave