Download Inhoudsopgave Inhoud Print deze pagina

Alecto SA241 Gebruiksaanwijzing pagina 15

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 1
INSTALLATION INFORMATION:
For your own safety; before installation, ensure all mains power has been disconnected. Once the installation is fully complete, you may
reconnect the 230V mains power.
Attach the ceiling plate using the included plugs and screws to the ceiling on a location of choice. Wall mounting is not recommended for
smoke detection. Remove the plastic foil from the backup battery and place it inside the battery compartment, minding the polarity. Attach the
detachable 230V connection cable to the cables leading to the electricity meter of 230V , you may attach the white link cable to another cable
to lead to the lead-cable of any other SA-240 model to link both models. Do not attach this cable to the earthing cables.
ATTENTION. Do not switch the phase (brown) and 0-(blue) cables. The smoke detector will not function correctly if you do this.
Now plug the 230V connection cable you installed into the SA-240. The connector only fits at one single angle. Then place the detector on
the ceiling plate and twist it into place. Now reconnect the power to mains. The green LED should now light constantly. Perform a first test by
holding the test key for two seconds. Also see the paragraph: "Testing".
SLAAPKAMER
WOONKAMER
2.
HOME-OFFICE
Brown - Connect to phase
White - Cable to connect to other smoke alarms of the same type (DO NOT attach to any
BADKAMER
SLAAPKAMER
ground cable)
Blue - Connection to 0
KEUKEN
GARAGE
1.
9V BLOCK
HOME-OFFICE
HOME-OFFICE
SLAAPKAMER
SLAAPKAMER
SLAAPKAMER
SLAAPKAMER
KEUKEN
KEUKEN
WOONKAMER
WOONKAMER
BADKAMER
BADKAMER
GARAGE
GARAGE
15

Advertenties

Inhoudsopgave
loading

Inhoudsopgave