6
Start-up
6.1
General
Before start-up, it is vital that the unit is filled with the delivery medium and ventilated. Close to the
inlet nozzles of the pump, it should also be the required minimum intake pressure. The system
can be ventilated via the pump. The pump itself is self-ventilating.
6.2
Operational control
After switching on the power supply the pump must start up independently: the Biral impeller turns
and flashes green.
Watt display
LED 4
[W]
7
Settings
7.1
Control panel
Warning
There is a risk of burning! For high media temperatures the pump may become so
hot that only the keys may be touched
A2
A1
Status display
LED 3
961935_00
OFF
LED 1
LED 2
LED 3
LED 4
961935_00
PP1
LED 1
LED 2
LED 3
LED 4
Status
Pump running
A1
Control panel for setting the type of
control.
PP1
A2
Keys for setting delivery height and
delivery flow.
LED 1
Display control curve
characteristics set (phase)
LED 2
Display the curent delivery height
•
V
(25 ... 100%)
LED 3
Status display
LED 4
Watt display
Änd.Index
Datum
Visum
PrimAX
Bedienfeld
für BA
Biral AG
CH-3110 Münsingen
Weitere Bilder siehe 961971
english
LED 4 LED 3
LED 4 LED 3
Änd.Index
Datum
Visum
Ersetzt durch:
PrimAX
Bedienfeld
für BA
Biral AG
CH-3110 Münsingen
Weitere Bilder siehe 961971
LED 4 LED 3
LED 4 LED 3
Ersetzt durch:
Ersatz für:
Massstab
gezeichnet 18.05.2015
ts
geprüft
11.09.2015
ts
Freigabe
11.09.2015
ts
PDM_Nr
TD-0030188
Zeichnungsnummer
Änd.Index
961935
00
89
|
Ersatz für:
Massstab
gezeichnet 18.05.2015
ts
geprüft
11.09.2015
ts
Freigabe
11.09.2015
ts
PDM_Nr
TD-0030188
Zeichnungsnummer
Änd.Index
961935
00