Download Inhoudsopgave Inhoud Print deze pagina
Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

INSTALLATION INSTRUCTIONS

Install the electrolytic cell on the by-passed pipes after
filtration of the pool cycling pipe system. And an adjustable
valve must be installed in the main pipe. (see figure 1).
The chlorinator should be mounted in a well-ventilated, dry,
and shady location, so it is not exposed to drain or direct
Figure 1
sunlight.
And the power pack should be mounted onto a post or wall 1.5
meters above the pool water, to ensure the gap surrounding no
less than 100mm, with sufficient ventilation for its heat
dissipated. The left side of power packis for cooling exhaust,
where should not be blocked or too close to other equipment to
affect its heat dissipated.
Using the template supplied in this Manual, mark two holes
distant 180mm for fitting the Power pack to the wall, drill two
holes for fixing 2 pieces M8 screws, align two holes of power
pack backside and push it down for fix. HINT if fitting against a
limestone wall, use a piece of wood as backing to prevent
Figure 2
corrosion of the Power Pack bracket.
Connect the 2 red and 1 black electrode contact to the two poles of the generator,
2 ( + ) pole tip and 1 ( - ) pole tip correspondingly; then connect the control box and the
generator with the water level / temperature joint wire correspondingly. (see figure 2 / 3).
Note: The chlorinator must be supplied by power supply with a leakage switch
(AC220V-240V/50Hz, 16A), and supplied through a residual current device (RCD)
with a rated residual operating current not exceeding 30mA.
Figure 3
7

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Sq030Sq040Sq050Sq060

Inhoudsopgave