Installation
3.
Installation
3.1
Safety information for installation
D WARNING!
Hazard through disregard of the installation instructions!
This chapter contains important information for the safe
installation of the device.
☞ Read through this chapter carefully before installing the
device.
☞ Follow the safety instructions.
☞ Carry out the installation as described.
y Installation only by qualified specialist personnel.
D "1.2 Authorised target groups" (page 60).
y Electrical work only to be undertaken by qualified
electricians.
D "1.2 Authorised target groups" (page 60).
y The hob and other parts that can be touched must be
allowed to cool prior to installation.
y Store the film or other parts of the packaging in a location
which is inaccessible to children.
y The device must be in an undamaged and fault-free
condition prior to installation.
y Cables must not be kinked, crushed or damaged.
y Never open the fan housing.
y The power supply voltage must match the voltage
information quoted on the ratings plate.
D "2.5 Technical data" (page 63).
y Ensure that the power supply is stable and remains so
prior to the installation.
Connect the power supply only when instructed to do so
in the installation instructions.
Observe the safety information in the documentation for
the hob.
64
3.2
Requirements for the installation location
D WARNING!
Risk of death due to improper installation!
Disregard of the ambient conditions can lead to hazardous
situations, e.g. in the handling of electrical power or gas.
☞ Make sure that the requirements for the installation
location are complied with.
y Do not install in potentially explosive atmospheres.
y Whilst using a heating point which uses air from the room
as its oxygen supply (e.g. fireplace):
y A safety device is absolutely essential.
y The safety device (e.g. under-pressure monitor P4,
tested per DIN 18841:2005-12 TÜV and per DVGW-VP121)
must prevent gases being drawing to the room.
y An approval for commissioning (e.g. from a
chimneysweep) must be available.
y If it is necessary to break through the wall:
A wall break-through influences the structural integrity of
the building. There is a danger of collapse. This work must
only be carried out by a specialist.
y Make sure that the building electrical supply is properly
earthed.
y The power supply voltage present must match the
voltage information quoted on the ratings plate.
y A socket must be available in the vicinity of the
installation.
y The mains plug must be accessible after the installation
of the hood. Alternatively, all-pole isolating device (with a
contact gap of at least 3 mm) must be provided.
y The recirculated air filter must be freely accessible at all
times in order to change the filter filling. The space must
be sufficiently large to allow the retainer clip to latch.
y During recirculated air mode sufficiently large ventilation
slots must be available for the ventilation.
y The air flowing out must be able to dissipate unimpeded.
Do not impede the air flow, e.g. through the installation of
objects on or above the device.
Country-specific, legal provisions must be observed.
4600947_a – 05.10.2017