Download Inhoudsopgave Inhoud Print deze pagina

Initial Operation; Signal Strength - Simons Voss Technologies SmartBridge Gateway Node 2 Korte Handleiding

Inhoudsopgave

Advertenties

SmartBridge Gateway Node 2
RouterNode 2

6. Initial operation

System 3060:
RouterNode 2
MobileKey:
SmartBridge
SmartIntego:
Gate-
wayNode 2

6.1 Signal strength

EN
If you install the cables under the plaster, then use
the opening integrated in the base plate.
If you lay the cables on the plaster, then you must
modify the housing.
After installation, the device must be put into
operation. Initial operation varies depending on the
system.
LSM must be able to communicate with RouterNode
2. The connection between LSM and RouterNode 2 is
established by using the WaveNet Manager. For
details, please refer to the manuals for RouterNode 2,
WaveNet and WaveNet Manager.
You can manage network-compatible locks wirelessly
in MobileKey with the SmartBridge. To do this, set up
at least one SmartBridge via the MobileKey interface.
Please refer to the MobileKey and SmartBridge
manuals for details.
You can manage network-compatible locks in
SmartIntego wirelessly with GatewayNode 2. Please
refer to the SmartIntego technical manual for details.
Signal strength, as with all radio devices, depends on
several factors, including:
Centres distance
Structural conditions (e.g. metal surfaces or
reinforced concrete as building material)
6. Initial operation
37 / 148

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Smartbridge routernode 2

Inhoudsopgave