Download Inhoudsopgave Inhoud Print deze pagina

Connection Of Ethernet Variants; Commissioning; First Commissioning; Ndl - Moehlenhoff BSF 20102-04 Handleiding

Verberg thumbnails Zie ook voor BSF 20102-04:
Inhoudsopgave

Advertenties

3.2.9 Connection of Ethernet variants

The base stations BSF xx2xx-xx are equipped with a RJ45 interface and an integrated web server for
the control and the configuration of the system via PC/laptop over the home network.
¾ Integration of the base station into the network via network cable, or direct connection to
PV/laptop
Set-up in the home network
¾ Open the router menu (see manual of the respective device) via the address bar in the web
browser (Internet Explorer, Firefox, ...).
¾ Open an overview of all devices in the network.
¾ Compare to the MAC address (see type sign) in order to find out the IP address allocated to
the base station.
¾ Note the IP address of the base station and enter it into the address bar of the web browser
in order to open the web interface.
Direct connection to PC/laptop:
¾ Open the network settings in the PC/laptop and assign the IP address 192.168.100.1 as well
as the subnet mask 255.255.0.0 manually to the PC.
¾ Access to the web interface can be gained by entering the IP address 192.168.100.100 in the
address bar of your web browser.
You can find further information on the set-up under www.ezr-home.de.

4 Commissioning

4.1 First commissioning

The base station is in installation mode during the first 30 minutes after switching on the mains
voltage. The target and actual temperatures are compared in this mode, all other functions are
deactivated. If the actual temperature is below the target temperature, the output allocated to
the respective room control unit is activated at the base station. This allows signalling at the base
station without delay, enabling the control of the allocation between the room control unit and the
output of the base station.
¾ Switch on the mains voltage.
9 The base station initialises the installation mode for 30 minutes.
9 If the base station is parameterised for NC actuators, all heating zones are activated for 10
minutes in order to unlock the first-open function of the NC actuators.
9 The power LED (operation display) lights up continuously.

4.2 Control operation

After the end of commissioning and the installation mode, the control operation of the Alpha 2
System starts. The control operation provides two control functions
Main function
The main function is predominant and controls the heating zones to the room temperature accord-
ing to the target value previously set.
Auxiliary function (load compensation)
The auxiliary function distributes the load of the heating circuit distributor evenly and in an opti-
mized way to all heating circuits used (load compensation). Thus, the load compensation allows
DEU
ENG
FRA

NDL

ITA
ESP
37

Advertenties

Inhoudsopgave
loading

Inhoudsopgave