Download Inhoudsopgave Inhoud Print deze pagina

Installation; Boiler Fixing; Fuel Supply - Riello RG1RKD Handleiding Voor Installatie, Gebruik En Onderhoud

Inhoudsopgave

Advertenties

3.

INSTALLATION

3.1 BOILER FIXING

Fig. 2
Fig. 3
Put on the flange (1) the screw and two nuts, (see Fig. 3).
Widen, if necessary, the insulating gasket holes (5), (see Fig. 4).
Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interposing the
insulating gasket (5), (see Fig. 2).

3.2 FUEL SUPPLY

1
The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and cable clamp (2) should be reversed, (see Fig. 5).
2305
S7189
Fig. 5
2
3
GB
Fig. 4
D5012
1
D5701

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

3736650

Inhoudsopgave