Download Print deze pagina

EdilKamin INPELLET 49 Installatie, Gebruik En Onderhoud pagina 30

Verberg thumbnails Zie ook voor INPELLET 49:

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 97
FACILITATION KIT FOR INSTALLATION
• Composition:
B) base plate
C) smoke channel centring bracket
E) Pellet loading tube centring bracket
Assemble the facilitation kit as shown in fi gure 5.
• If installing in existing fi replaces, it is recommended that an
80mm diameter steel chimney fl ue be placed in the existing
chimney fl ue.
In the same case, it is essential to completely block the resul-
ting space between the new stainless steel chimney fl ue and the
old masonry chimney fl ue with several layers of ceramic fi bre
padding or another similar material (see fi g. 8 letter G).
• Install the base plate (B) of the kit in the position where
INPELLET 49 will be placed (fi g. 4). Secure the plate (B) with
the bolts provided.
• Fit the chimney fl ue on the collar of the bracket (C) placing it
on the dedicated screws (*) (fi g. 5).
• Fit the pellet loading tube on the collar of the bracket collar
(E fi g. 5 to the side and fi g. 3 on pg. 28), securing it with the
clamp supplied.
• Position INPELLET 49 sliding it along the plate (B) until it
reaches end-of-travel (fi g. 6).
• Through the opening (H) set on top of INPELLET 49, re-
move the support screw (*) and fi t the smoke channel onto the
smoke outlet (F), blocking it in place with the screw (*) and
sealing with high temperature mastic (fi g. 7).
fi g. 8
G
INSTALLATION
fi g. 4
fi g. 5
fi g. 6
fi g. 7
mat
steel rod
- 30
-
B
E
*
B
B
*
F
H
C
C
D

Advertenties

loading