Download Inhoudsopgave Inhoud Print deze pagina

EdilKamin INPELLET 49 Installatie, Gebruik En Onderhoud pagina 28

Verberg thumbnails Zie ook voor INPELLET 49:
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 97
PELLET LOADER INSTALLATION
Note:
• The loading inlet can be installed on the front, on the right
side or on the left side of the mantel.
• Shortening the pellet loading tube (supplied with a length
of 80 cm), depending on the position of the hearth, is man-
datory so that it stays taut, in order to facilitate the pellets
dropping into the hopper.
• Before fully closing the mantel, carry out pellet loading
test to make sure they drop correctly.
• Correctly insulating the loading tube is mandatory as it
must not come into contact with the smoke channel.
1st phase
INSTALLING THE LOADING INLET WITH DOOR
(fi g. 1 and 2)
• Only mount the front or side wall of the mantel, onto which
the loading inlet will be attached;
complete the mantel only after verifying the correct opera-
tion of the entire loading system.
• Make a 18.5 x 18.5 cm hole.
• Secure the loading inlet to the mantel using the self-tapping
screws supplied, using the holes on the mantel frame; reinforce
the plasterboard, attaching metal profi les on the rear (A fi g. 2).
2nd phase
INSTALLING THE LOADING TUBE (fi g. 2 and 3)
• Secure the fl exible tube to the outlet on the loading inlet using
the clamps supplied (fi g. 2)
• Cut the tube to size and fi t the end of the tube on the centring
bracket (E fi g. 3 to the side and fi g. 5 on pg. 30) and fasten it
using the clamps provided.
3rd phase
COMPLETING THE MANTEL
Before fully closing the mantel, carry out pellet loading test
to ensure the pellets are dropped correctly and there are no
obstacles to proper loading.
INSTALLATION
fi g. 1
LOADING
INLET
LOADING
TUBE
fi g. 2
fi g. 3
- 28
-
A
A
METAL REIN-
FORCEMENTS
E

Advertenties

Inhoudsopgave
loading

Inhoudsopgave