Download Inhoudsopgave Inhoud Print deze pagina

Stiebel Eltron HSTP 200 Handleiding Voor Bediening En Installatie pagina 26

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

inSTallaTion
SPeCifiCaTion
connection example for dual circuit, dual meter reading
1/n/Pe ~ 230 V or 3/n/Pe ~ 400 V
PE
K1
K2
4
L1
L2
L3
N
K1
Contactor 1
K2
Contactor 2
1
Connections also required
for 3/N/PE ~ 400 V
2
Power-OFF contact
3
Off-peak tariff meter
4
Peak tariff meter
f Ensure connection to the same phase.
f
26
| HSTP
5
K2
K1
connection examples for a single circuit:
In the following connection examples, the output of the booster
heater is given in brackets.
Note the position of the circuit breaker in the control panel.
switch position i: 2 (4) kw, 1/n/Pe ~ 230 V
switch position ii: 4 (4) kw, 1/n/Pe ~ 230 V
1
switch position i: 2 (6) kw, 3/n/Pe ~ 400 V
2
3
switch position i: 3 (6) kw, 3/n/Pe ~ 400 V
switch position i: 4 (6) kw, 3/n/Pe ~ 400 V
switch position ii: 6 (6) kw, 3/n/Pe ~ 400 V
www.STiebel-elTron.CoM

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Hstp 300Hstp 400

Inhoudsopgave