Download Inhoudsopgave Inhoud Print deze pagina

Wiring; Start-Up; Purging The Product - Vaillant VPS R 100/1 M Installatie- En Onderhoudshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 46

6 Start-up

5.1.2.4 Case no. 4
2
2
4
1
1
1
Heat pump
2
Boiler
5.2

Wiring

Note
If the temperature sensor is not enclosed, this
must be ordered separately.
1.
Screw the sensor pocket (1) into the cylinder.
2.
Screw the stuffing box (2) into the sensor pocket (1).
3.
Use a thermal conductivity lubricant to insert the tem-
perature sensor (3) into the sensor pocket (1).
Applicability: VPS R 200/1 B
To guarantee the leak-tightness of the cylinder, always
install the two sensor pockets, even if only one tem-
perature sensor is used.
74
3
4
4
4
3
3
Heating circuit
4
Plug
1
2
3
6
Start-up
1.
When filling the product, observe the installation instruc-
tions for the heating generators.
2.
Check that the hydraulic and electric connections are
correctly designed.
3.
Check whether the connections are leak-tight.
4.
Purge your heating installation.
6.1

Purging the product

Applicability: VPS R 100/1 M
B
C
Open the purging valve (1) when filling the heating
circuit with water.
Applicability: VPS R 200/1 B
1
Open the purging valve (1) when filling the heating
circuit with water.
1.
Close the purging valve as soon as water flows out (re-
peat this measure several times, if required).
2.
Check whether the air separator connection is leak-
tight.
Installation and maintenance instructions 0020244064_01
1
A
B
C

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Vps r 200/1 b

Inhoudsopgave